Program 3 datacenter with emergency power systems and cooling, 3 commercial buildings, underground car park, park<br>
Client Green Data Center AG
Planning and realization 2020 - 2024
Project costs N/A
SIA phases 31-53 (without construction management)
Status in progress<br>
Services Overall management, general planning construction, architecture

The Zurich Metro Campus is being built in Dielsdorf (ZH), consisting of three high-performance large-scale data centers and a business park with three office buildings. The data centers will accom­modate 27 power supply systems and 24 cooling machines when fully expanded, which will provide a total capacity of 33MW for the server rooms with an area of 15,000 m2 of whitespace.

The building complex is located in an area with challenging subsoil conditions and a high groundwater level. To create the excavation pit, a groundwater lowering system was installed using the wellpoint method and nailwalls, frictionwalls and sheet piling were used to secure the excavation pit.

The complex building services require extensive instal­lations that strongly affect the supporting structure.

In addition to the planning and dimen­sioning of the pure supporting structure, the planning and coordi­nation of the works lines for the entire plot of land made up a signi­ficant part of the civil engineering services in this property. The coordi­nation of works pipes and sewerage, with more than 75 km of cable protection pipes laid among other things, as well as the requi­rements of cantonal requi­rements and the munici­pality regarding drainage was a challenge.

The building envelope of the data centers was realized as a sandwich system with a stretch metal cladding as the outermost layer, so that the very large volumes can be integrated into the environment in a meaningful way. The materia­lization of the buildings reflects their technical content and enables an optimal inter­action with the needs of the building technology.

Glass facades were imple­mented in the office buildings, which form the face of the area towards the public.

MBA planned and imple­mented this project as general planner for shell and core and overall General Manager across all departments in close coope­ration with proven planning partners from the preli­minary project to the handover of the keys.

The project organization provided for a general contractor each for the construction of the building envelope (shell+Core) and for the building technology expansion. The resulting interfaces were managed by MBA through the entire tender, the construction site organization and cost accounting.

The first construction phase – DataCenter M – was handed over to the end user on time. The other stages are currently under construction.

The team of engineers from Emch+Berger, which specialises in data centre construction and special construction tasks, carried out the planning and execution as sub-planners of MBA Projekt­ma­nagement AG. This team of engineers switched to MBA during execution due to internal restruc­turing at Emch+Berger. The know-how about such special structures is now directly available at MBA Projekt­ma­nagement AG.