Datacenter Metro Campus Zurich, Dielsdorf

Datacenter Metro Campus Zurich, Dielsdorf

Program 3 datacenter with emergency power systems and cooling, 3 commercial buildings, underground car park, park<br>
Client Green Data Center AG
Planning and realization 2020 - 2024
Project costs N/A
SIA phases 31-53 (without construction management)
Status in progress<br>
Services Overall management, general planning construction, architecture

Green Datacenter AG is a Swiss datacenter provider. A campus with 6 buildings is planned at the new location in Dielsdorf. The facility consists of 3 datacenter and 3 commercial / office buildings. All buildings are planned to be four-storey. The datacenters will accommodate 27 mains backup systems and 24 chillers in their full configuration, which will ensure a total output of 33MW for the server rooms with an area of 15'000 m2 of whitespace. The building envelope of the datacenters is realised as a sandwich panel system with an expanded metal cladding as the outermost layer. The materialisation of the buildings reflects their technical content and enables optimal interaction with the building services. Glass facades are planned for the head buildings of the site. MBA is realising this project as general planner and overall manager in close cooperation with its proven planning team. As in previous projects, the project organisation provides of one general contractor each for the construction of the building envelope and for the building services equipment.